Tuesday, January 26, 2016

Tee & Green Nursery


This fall we began construction on a very large nursery tee and green on Militia Hill between holes 6 and 8.  The nursery will be primarily used for our season-long divot-plugging efforts, as well as range sod replacement.








Laser Level Grading of Nursery Tee


Fusing Sections of HDPE Irrigation Pipe


Trenches Are Dug For Our Irrigation Pipe


Wiring Sprinkler Heads for the Irrigation System


Excavating the Nursery Green to a Depth of 16 inches


Final Shape of Nursery Green Sub-Grade


Drainage Channels Installed


Drainage Gravel Layer


Filling the Greens Cavity with 12 inches of Sand Mix